From: |
SP52948 owner |
To: |
Robert Crosbie, Frank Tallaridi |
Subject: |
Re: OFFICIAL COMPLAINT: Poor appearance of garden beds and lack of maintenance just two and a half years after major upgrades - 6Mar2020 |
Date: |
6/3/20, 7:49 pm |
Good evening,
Poor and repeated patchwork is not a professional solution, especially
when building manager's contract costs owners well above $300,000.00 per
year.
Photos show that not only the colour of the patched area does not match
the rest of the garden wall, but other areas will deteriorate very soon.
Few photos attached.
On 16/2/20 9:24 am, SP52948 owner wrote:
Good morning,
Photos speak form themselves.
Bubbling paint, peeling paint, rusting of louvres, and much more.
During recent heavy rain evidence was also collected of water leakages
through four piping conduits in the basement (one even going directly
inside a garage of an owner onto their car). The leakages are not in
the area where garden beds are located but straight below the buildings.
In addition, video and photo evidence was collected of water leak on
level 5, 6, and 7 in fire stairs of Block B during heavy rain on 9
February 2020.
It is noted that Waratah Strata Management, at AGM 2019, bluntly and
in an ignorant manner refused to deal with overdue repairs of roof
membranes on half-roof of Block B, and whole roof of Block A and C,
stating that "they would be repaired when the problem occur"
(reactive maintenance). Waratah Strata Management and maintenance staff
ignored professional assessments so far and failed
to document it in the minutes of the general meeting.
Regards,